PPSCFPSCNTSPakistan govt jobs
- Subject
- Building Materials and Constructioncivil-engineering-mcqs › building-materials-and-construction
- Published
- 11 Jan 2019
- Last updated
- 28 May 2026
Explanation
For raft foundations on clayey soils, the total settlement should generally be controlled within 65 to 100 millimeters to ensure structural safety and serviceability. Settlements less than this range are often considered conservative, while exceeding it may lead to structural issues.
More Building Materials and Construction MCQs
Practice related questions from the same subject.
- 1.What are the benefits of having the correct amount of entrained air in concrete?
- 2.How does cast iron compare to mild steel in terms of compressive and tensile strengths?
- 3.How does double Flemish bond differ from English bond in terms of structure?
- 4.What is the maximum allowable differential settlement for foundations constructed on sandy soils?
- 5.Which type of footing is designed to transfer substantial loads from steel columns to the ground?
- 6.In a collar beam roof, where is the horizontal tie typically located?
- 7.In stair construction, what does the term 'string' refer to?
- 8.What is the minimum recommended number of steps in a flight of stairs?
More in Civil Engineering Mcqs
- Airport Engineering
- Applied Mechanics and Graphic Statics
- Construction Planning and Management
- Design of Concrete Structures
- Design of Masonry Structures
- Design of Steel Structures
- Dock and Harbor Engineering
- Elements of Remote Sensing
- Engineering Economy
- Environmental Engineering
- Estimating and Costing
- Fluid Mechanics
- Highway Engineering
- Hydraulics and Fluid Mechanics
- Irrigation, Water Resources Engineering and Hydrology
- RCC Structures Design
- Railway Engineering
- Soil Mechanics and Foundation Engineering
- Strength of Materials
- Structural Analysis
- Structural Design Specifications
- Surveying
- Theory of Structures
- Tunnel Engineering
- Waste Water Engineering
- Water Supply Engineering